From first call to first water.

A pilot-first process that starts with the site and ends with a serviced, operating unit. Every step is project-specific; here is how it works.

The process

Seven steps, one accountable partner.

NextEra H2O handles deployment, permitting, commissioning and service for its units in the U.S.

  1. 01

    Discovery

    A first conversation about the facility, the location and the water problem.

  2. 02

    Site & climate assessment

    Humidity profile, temperature, power, siting and current water use.

  3. 03

    Formal estimate

    A project-specific estimate of output range, structure and scope, in writing.

  4. 04

    Permitting & site prep

    Permits by jurisdiction, the pad, power connection and storage tie-in.

  5. 05

    Delivery & commissioning

    The containerized unit is set, connected and started up.

  6. 06

    Water-quality testing

    Testing per site and jurisdiction before water goes to its intended use.

  7. 07

    Operate & service

    Recurring service and maintenance for the life of the unit.

Pilot program

Prove it on your site first.

Atmospheric water output depends on local air. That is why we pilot first: a smaller deployment that turns local conditions into measured data before a facility commits to scale.

  • Measured, not modeled. Pilots are intended to generate measured performance data at the site.
  • Across climate extremes. Piloting in both dry and more humid conditions shows the real range.
  • A path to scale. A successful pilot becomes the basis for a larger deployment.
Inside the actual unit: the blue air-handling blower and motor
Photo inside the actual unit

What we need from you

Bring these to the first conversation.

Location

Address or parcel, and where on the site a unit could sit.

Water use today

What water is used for, roughly how much, and what it costs to treat.

Power

Available electrical service near the proposed location.

Goals

Resilience, permitting, treatment, sustainability, or all four.

Responsibilities

Who does what.

Typical responsibilities in a deployment
ItemNextEra H2OSite owner
Site & climate assessmentLeadsProvides access and site data
Formal estimatePreparesReviews and approves
PermittingLeads for the unitSupports for the property
Pad & powerSpecifiesTypically provides
Delivery & commissioningLeadsProvides access
Water-quality testingCoordinatesConfirms intended use
ServiceProvides for the life of the unitProvides access

Typical split; responsibilities are confirmed in each project agreement.

Next step

Start with a site review.

A first conversation is free, and it’s the fastest way to find out whether atmospheric water fits your site.