Priority market · Data centers

Water is deciding where compute gets built.

Large Southwest data-center campuses need a great deal of water for cooling and process use, and water availability increasingly determines where new capacity can go.

The challenge

Compute is growing faster than the water that cools it.

Evaporative cooling and process systems draw on municipal allocations that are under strain across the Southwest. New campuses face permitting questions about water, and operators face growing scrutiny of their water footprint.

Where NextEra fits

An on-site supply, made from the air above the campus.

Grid-powered units at the point of use turn ambient air into water for the cooling loop, reducing dependence on stressed municipal supplies.

  • Municipal-independent supply at the point of use.
  • Mineral-free water that can reduce softening and chemical treatment of makeup water, where applicable.
  • Designed for arid conditions and grid-powered on site.

Use cases

Where the water goes.

01

Cooling makeup

Supplement the water that evaporative and hybrid cooling systems consume.

02

Process water

On-site water for process needs across the campus.

03

New-campus permitting

An on-site source that changes the water conversation for new capacity.

04

Drought reserve

A buffer that keeps producing when shortages tighten.

Live diagram · Data centers

From desert air to the cooling loop.

How a grid-powered unit on the campus turns ambient air into an on-site supply, independent of the municipal allocation.

Schematic: ambient air, absorption, water recovery, multi-stage filtration, on-site reservoir, data hallNextEra H2O unit · grid-powered, on site01Air in02Absorption03Water recovery04Filtration05Reservoir06Data hallSchematic: ambient air, absorption, water recovery, multi-stage filtration, on-site reservoir, data hallNextEra H2O unit01Air in02Absorption03Recovery04Filtration05Reservoir06Data hall

Schematic, not to scale. Internal machine components are intentionally not depicted. Output varies with humidity and site conditions.

The anchor opportunity

The Stratos Project.

A planned large-scale data-center campus in Box Elder County, Utah, where water is a deciding constraint.

About Stratos
The NextEra H2O container on a desert site at dusk
Composite of photos of the actual unit · NextEra livery · stock backdrop

Getting started

How a project starts.

  1. 01

    Site review

    Climate, humidity range, power availability and siting.

  2. 02

    Sizing

    Matching demand to Machine A or Machine B, singly or combined.

  3. 03

    Storage & distribution

    On-site reservoir and tie-in to where water is used.

  4. 04

    Service

    Recurring maintenance, or Water-as-a-Service.

Status. Southwest data-center operators are part of NextEra’s commercial pipeline as opportunities in development. No purchase agreements are signed today for the pipeline. The anchor opportunity is the Stratos Project.

Next step

Tell us about your site.

Share the location, the facility and how water is used today, and we’ll tell you honestly whether atmospheric water fits.